Key Dates
2024 Traffic Study Results
Over the course of several months, City engineers studied the area of Northwest Boulevard and Virginia Avenue and surrounding streets to assess any potential impact of the median closure. Based on the results of the study and the recommendation to make the temporary median closure permanent, the next phase will include design of a median extension to be constructed at a future date yet to be determined. For detailed information, please refer to the attached traffic study in documents tab below.